McConnections Sage Link for McDonald's Restaurants
by Envisage Cloud Ltd.

Version 1.0.0.25 - Release Notes

Release Note Summary
New McDonalds Excel Report Reporting Module, click here for more details
New Report Settings Save/Load Reporting Module, click here for more details
Bug Fix Profit and Loss Report Bug Reporting Module, click here for more details
Change Balance Sheet - Added YTD Column Reporting Module, click here for more details
Bug Fix Windows 8 Screen Optimization Common, click here for more details
Bug Fix Mail Engine Common, click here for more details
Reporting Module features fixed, adjusted or added
New McDonalds Excel Report The McDonalds Excel Report has been adjusted for the first test with McDonalds Head-Office, this feature is still on a BETA stage.
Back to Top
New Report Settings Save/Load A new feature has been added to save, and load, Profit and loss and Balance Sheet Report Settings. There is a new drop down button on the top-right of the Report Settings screen that allow the user to either Save the current report settings or Load a previously saved setting file.

The files saved are of XML format, however the extension of the file generated is not XML but it is:
  • McConnections P&L Report Settings file extension: *.mcrpl
  • McConnections BS Report Settings file extension: *.mcrbs
Back to Top
Bug Fix Profit and Loss Report Bug If the option 'Show lines with zero values' was un-checked when setting the report criteria, an error would occur and the report was not generated.
This issue has now been fixed.
Back to Top
Change Balance Sheet - Added YTD Column The Balance Sheet Report was only showing the current period to date column, the YTD column with cumulative values has now been added to the report.
Back to Top
Common features fixed, adjusted or added
Bug Fix Windows 8 Screen Optimization Some screen would not display properly on Windows 8, most screens should now be better optimized for Windows 8

NOTE: Since Windows 8 uses a completely new interface framework (named: Metro), it is possible that some screen may still have some minor displaying issues.
Back to Top
Bug Fix Mail Engine The mail engine was taking the screen shot too soon, in some cases the 'Enter Query Message' screen of McConnections was still showing with some level of transparency.

A delay of 500 millisecond has been applied before the screen shot is taken.
Back to Top